Topsides, Jacket and Piles
For a brief history on the Audrey Field refer to project gallery page for Philips Audrey A Phase I.
In 1988 Phillips awarded the Ardersier Yard a contract to build the Audrey B platform, this facility being similar in many respects to the Audrey A wellhead platform which the Yard completed in 1987. The notable differences between the platforms were a reduction in the number of well slots and the export riser sizing. The completed Wellhead Deck, Jacket and Piles sailed from the Yard in 1989 and after peak output from the facility in the early 1990’s production gradually reduced and ceased in 2016.