Booster Platform
This project, known as Phillips Norpipe 36/22A comprised of an 8 leg Jacket, Piles & Cellar Deck Module, and was fabricated whilst construction of the yard facilities was still in full swing. The platform was installed in the British Sector of the North Sea to serve as a pumping station to increase pipeline pressure on Norpipe between Ekofisk and an onshore terminal on Teesside. Following loadout from the Yard, the platform was installed and operational between 1975 and 1994 when it was shut down before being removed during 2009-2010.