Jacket and Module Lift Frame
Following final assembly on a set of temporary skid rails the Jacket was loaded out in July 1983 with offshore installation following in the same month. Platform Start-up was in 1985 with production continuing until 2019 and removal of the platform in 2023. The platform was located in the South Morecambe Field (UKCS Block 110/2a) which lies in a cluster of Morecambe Fields located approximately 27 km west of Blackpool