Helidecks and Bridges
This initial L10 project for Placid Oil comprised of two helidecks and two platform connecting bridges. The Yard was to go on to fabricate a number of platforms for the L10 Field, which was a major gas reservoir in the Dutch sector. The field which is located approximately 65 km west of Den Helder, commenced production in 1976 and was still operational into the mid-2020’s