Flowline
The Foinaven flowline measuring 49 km was the first pipeline to be fabricated and reeled at the Spool Base on the Yard then installed by the Norlift vessel offshore in 1995.
Home > Projects & Gallery > 1995 > Foinaven (FL) 1995
(You can click each image to view a larger version)
Flowline
The Foinaven flowline measuring 49 km was the first pipeline to be fabricated and reeled at the Spool Base on the Yard then installed by the Norlift vessel offshore in 1995.
The McDermott Yard in Ardersier, Scotland was active between 1973 and 2000 manufacturing equipment for the offshore industries.