Jacket & Piles + 2 Modules
The contract to build Marathon Brae B Jacket and Piles which was awarded to The Ardersier Yard in late 1984 represented a scope of work very similar to the earlier Brae A Jacket & Piles loaded out in 1982. The notable differences between the 2 Jacket facilities were the number of well slots to be deployed and the number of risers. Also awarded at the time was a contract build two Compression Modules each weighing 2,650 Tonnes and supporting two Dresser compressor skids which were further fitted out with associated compression train equipment.
Following completion and loadout from the Yard, the Brae B platform was installed in 1987 and production commenced in 1988.