Utilities Modules
Discovered in 1974, North Cormorant was typical of the drilling and production platforms installed at the time where the Topsides were built-up from a series of drilling, process and utilities Modules. The Yard was awarded a contract to build the Utilities, Power Generation and Water Treatment Modules, with all three Modules each weighing approximately 1200 Tonnes.
The completed Modules sailed from Yard in 1981 and production commenced on the platform in 1982. The North Cormorant Platform has been scheduled to cease production in the mid 2020’s