4 Leg Jacket
The structure built at the Yard as part of the BP ETAP Project was the Production Drilling and Riser (PDR) Jacket, which was one component in a complex of facilities installed as part of a large offshore development. The PDR platform was bridge linked to a Utilities and Accommodation platform and the two platforms combined served as the production hub for a number of other platform and subsea facilities within the field. Output from the ETAP field commenced in 1998 and in the year 2025 the facilities were still in production.